Hello everyone, I stumbled over a problem setting an inline variable substitution for the parameter "Start Time" necessary to determine the starting point in time for a network analysis.
I am trying to iterate over rows in a table, which give me details for a trip to be included in a network analysis (Route analysis), including the origin and destination point as well as the starting point in time for when the trip is being made.
I get the data for the starting time out of the respective field in the table via "Get Field Value". I then try to implement the value, named START, as inline variable substitution for the parameter "Start Time" in the Route Analysis Tool using %START%. But it doesn't work as planned because the parameter does not fill blue and input is gone as soon as I open the parameter again.
The format of the starting time data is 'dd.mm.yyy hh:mm:ss'. I tried formatting it as date, string or time format, but it won't work.
Is it even possible to dynamically change the value of a network analysis start time based on iterating through a data table containing various start times?