Hi guys, I'm having a difficulty in combining two different contour data from different sources and scale. i got my data from IFSAR having 1:10,000 scale with 5m contour interval and the other one from primary data in the field with 1:5,000 scale and 2m contour interval. What will be the right procedures to come up with DEM out of these two data? Thank you.

Tags (1)
0 Kudos
6 Replies
larryzhang
Occasional Contributor III

It depends on the accuracy of your two contour files.

For example, if both spatially are accurate enough (i.e., match on the same values of contours), the combination of two vector files (the GP tool ‘merge’) is first step for GIS uses;

However, if distorted on same values of contour, the lower accuracy of 1:10000 contours from IFSAR should be spatially adjusted to match the higher accuracy of surveying contours 1:5000 before merging..

0 Kudos
LeslieJawili
New Contributor II

Thank you for the comment, I'm really just confused because as you can see on the picture below the lines from the two data doesn't fit at all even though it both has the same projection. The red lines indicate the 800m elevation from the field data while the pink line is the 800m elevation of the IFSAR data. What will be my other parameter to reconcile these data since i don't have any layer files in IFSAR unlike in the field data that i have layers of roads and rivers. Please help me on this. Thank you.

map.jpg

0 Kudos
larryzhang
Occasional Contributor III

Honestly, you are facing a challenge.

From your snapshot, my view is:

Your higher-resolution DEM derived from IFSAR  is not reliable. Do you have any accuracy report on this dataset from data provider? Are those SAR images from space-borne RADARSAT or other?

Generally, without rectification along with GCPs or other references, this higher-resolution DEM data should NOT be unified with your DEM from surveying, which is more reliable and accurate...

The best way to do the rectification is that it should be re-started from two SAR pairs, before generating DEM.

0 Kudos
LeslieJawili
New Contributor II

Your right about it, one of our consultants advised me to convert the contour lines into point data then combine the 2 data sets, convert it to TIN then re-contour or interpolate it with 5m contour interval. I'm not satisfied with the output because it produces a lot of curvatures/triangulated forms when it was converted to TIN data.

Is it possible to fill the gaps of the field data using IFSAR?

0 Kudos
larryzhang
Occasional Contributor III

leslie,

In practice, you have an effective way to solve this challenge, i.e., to fill the gaps of the field data using IFSAR.

How? Please refer to Fill Voids in DEM

0 Kudos
larryzhang
Occasional Contributor III

Besides, as a reference, the slides on DEM generation from stereo-pair RADARSAR 2 without GCPs are advised to read at http://earth.eo.esa.int/pub/polsarpro_ftp/POLinSAR2011/Wednesday26/Methods&TheoreticalModelling/2_To...

0 Kudos