Hi all,
I'm having a bit of trouble with something that i'm sure should be very simple.
I have calculated the time cost of a series of paths from prehistoric sites to their nearest water sources using the cost path tool.
I now want to convert the raster outputs I created to a vector polyline, but when I do, the new vector table doesn't keep the "PATHCOST" raster values and I am left only with the shape length.
I could copy the data I need manually, but I would have to do this hundreds of times.
How can I do this Automatically?
Thanks,
Neta