Converting a GN to a UN for an electrical system. The way poles are drawn now they have no connection, (logical or spatial) to other features. Can we go into production with a UN and build all those attachments at a later time?
Solved! Go to Solution.
yes, you could go in to production with creating the associations between poles and equipment. However, you could also use a tool found in the Utility Network Package toolbox called Create Utility Network Associations. This will create the association between existing poles and any equipment found close to it.
yes, you could go in to production with creating the associations between poles and equipment. However, you could also use a tool found in the Utility Network Package toolbox called Create Utility Network Associations. This will create the association between existing poles and any equipment found close to it.