Solved! Go to Solution.
Sorry, my lacking scripting/syntax knowledge is what holds me back here. Here is what I am putting in as directed, yet the values are not calculated. Did I enter the right field in the output?
Howdy,
I have joined a sewer Gravity Main (pipes) table to my Manholes table based on [From_Manhole]. My next step was using the field calculator set the values of [Upstream_Elevation] in my Gravity Mains table equal to the values of [Invert_Elevation] from the joined Manholes table. However, when I try to execute this function, I get an error message. Am I using the right expression? The input field and destination fields are both Double with a precision of 38... not sure if this matters?
Here is what the geoprocessing results showed me:
infrastructure.PUBLICWORKS.ssGravityMain.Upstream_Elev= [infrastructure.PUBLICWORKS.ssManhole.INVERTELEV]
General Error executing calculator
ERROR 9999999
Syntax error
Failed to execute