Select to view content in your preferred language

Prevent Task output from getting added to map content

2857
1
10-02-2014 11:22 AM
BrianBaldwin
Esri Regular Contributor

Is there anyway to prevent a task process from getting added to the contents?  When I run a model via model builder it does not get added to the map contents, but when it is run via the task, it does.  There are a number of intermediate steps that I don't want to have displayed but I have not way to prevent it yet.

-----------------------------------

Brian Baldwin, Esri Inc., Lead Solution Engineer
https://www.linkedin.com/in/baldwinbrian
Tags (1)
0 Kudos
1 Reply
AmirBar-Maor
Esri Regular Contributor

If you are using a Task Step to call your GP model, it should behave exactly as if you run the model outside of a task.

Please submit a tech. support incident with your task file and GP model.

Thanks,

Amir

0 Kudos