Export Network GP tool output

616
4
Jump to solution
02-05-2020 11:21 AM
Labels (1)
RyanKoschatzky
Occasional Contributor III

In the gaps table, anyone know what the Gap_Type codes mean? I have values 0, 1 and 2.

Thanks.

0 Kudos
1 Solution

Accepted Solutions
PhilipHardy
New Contributor II

Ryan, this field specifies if the gap is a measure gap = 0, a physical gap = 1, or both = 2.  A measure gap is where there is a difference in the M value from one side of the gap to another. A physical gap is when there is an XY difference from one side of the gap to another.

View solution in original post

4 Replies
ColinSchut
New Contributor III

This is a guess, but could it be Gap Calibration type (Stepping increment, adding increment or adding euclidean distance)? We only have stepping increment gaps and all my types are 2.

RyanKoschatzky
Occasional Contributor III

I thought that also however we have only used euclidean distance so I wouldn't think we would have the other two types. 

0 Kudos
PhilipHardy
New Contributor II

Ryan, this field specifies if the gap is a measure gap = 0, a physical gap = 1, or both = 2.  A measure gap is where there is a difference in the M value from one side of the gap to another. A physical gap is when there is an XY difference from one side of the gap to another.

RyanKoschatzky
Occasional Contributor III

Thanks Phil.

0 Kudos