Work in parallel

152
0
04-15-2019 05:10 AM
ModyBuchbinder
Esri Regular Contributor

Hello all

I would like to understand what can be done in parallel in Pro.

I have a Dockpane with a button that run a long time (a few minutes) GP tool.

While it is running what should I be able to do?

I can pan and zoom.

Can I add/ remove layers from toc, turn visibility on/off?

Can I go to anther Dockpane and use buttons on it?

What are the limitation and is there a better way to program the Dockpane and the call to the GP tool to make it better.

Thanks (and happy PASSOVER)

Mody

0 Kudos
0 Replies