AnsweredAssumed Answered

Pulling data from the previous repeat

Question asked by asan@nps.gov_nps on Dec 20, 2018
Latest reply on Dec 23, 2018 by Philip.Wilson-esristaff

I have a form I created using an existing hosted layer feature on AGOL. The point layer is of water meter locations with a related table for monthly readings. Currently, my form is set for the field crew to type in the current month's reading, type in the Previous month's reading, and multiple that by a multiplier(a field present in the point layer) to get the value of GallonsUsed for the month. 

 

However, ideally, I wanted to somehow pull the Previous's month's reading(the value obtained from the previous repeat of that location) into a new repeat to avoid having to look up and type that value in, thus getting rid of the Previous month reading field altogether.

 

This is what I currently have in my calculation column:

Is what I want possible? Or we stuck with manually entering the values when creating a new repeat?

 

Thank you

Outcomes