AnsweredAssumed Answered

ArcMap - Calculation Based Projections

Question asked by CADEngr2014 on Oct 4, 2017
Latest reply on Oct 4, 2017 by MKennedy-esristaff

Hello,

 

I am using ArcMap 10.4.1.

I am still studying the concepts of projections.  I understand the ideas behind the developable surfaces and learned from several books that the surfaces are just an idealized way to explain the concepts of projections but that the developable surfaces are not literal in the calculation of a projection.  It seems to me that the math behind a projection would be like a vector intersecting the developable plane, normal to the surface, and the calculated change in location from an initial lat-long position, gives the new projected location.  However, if the developable surface is not literal in the projection calculation, it does not make sense without some consideration for the developable surface, it seems to me.  Even to use 3 dimensional trigonometry, treating a position on elliptical datum and the new point position on the developable surface, considers the developable surface in the projection.  Is it possible that the projection calculation really does utilize the developable surface, and the claim that it does not, is only in reference to Grid Based projections ?

Outcomes