Select to view content in your preferred language

Data Pipelines Scheduler off by 1 day

173
1
Jump to solution
08-19-2024 03:34 PM
JamesDrumm2
Occasional Contributor

Just recently we figured out that the day scheduling function is off by 1 day. Our standard schedules are set to run Mon-Fri 4 times a day (one scheduled run per time). However, looking at the history of runs, the pipelines are actually being triggered Sun-Thurs.

Was this intentional or a bug?

See the attached snips of our schedule configuration and the history.  Note the dates on the history 8/4 (was a sunday).

6bbbeb14-061e-43de-a33d-37cb1339ad6c.jpg

63cde35e-35c0-49cb-94fa-cbf6b4cd6372.jpg

0 Kudos
1 Solution

Accepted Solutions
BethanyScott
Esri Contributor

Thank you for reporting this @JamesDrumm2 !

We will fix this in the next update of ArcGIS Online (late October).

In the meantime, please set the schedule to run one day ahead (so instead of Monday-Friday, specify Tuesday-Saturday).

For your reference, or for anyone else who runs into this, the Esri Support bug number is BUG-000170149.

Thanks again,

Bethany

View solution in original post

0 Kudos
1 Reply
BethanyScott
Esri Contributor

Thank you for reporting this @JamesDrumm2 !

We will fix this in the next update of ArcGIS Online (late October).

In the meantime, please set the schedule to run one day ahead (so instead of Monday-Friday, specify Tuesday-Saturday).

For your reference, or for anyone else who runs into this, the Esri Support bug number is BUG-000170149.

Thanks again,

Bethany

0 Kudos