I experience inexplicable and inconsistent downstream trace results. I have really tried myself understanding what is going on - I do not get it though.
From a high voltage substation (HV/MV) I set a trace start flag on the secondary winding on one of the transformers and request a downstream trace - se screen dump below:
As the trace is set to continue into low voltage (target tier), of course I would expect the trace to do so. In the below screen dump, you see that it does not continue into the low voltage mesh (blue lines):
And zooming into a medium voltage substation (MV/LV) it is clear that the trace stops at the MV/LV transformer - se screen shot below:
Really strange, cause I have successfully run an update subnetworks on the low voltage mesh, so I know that the trace from this transformer and downstream should work.
Now, moving the trace start point (from the HV/MV transformer secondary) to just outside this substation and running the exact same trace I reach this inconsistent result that you see below - the trace continuing through the MV/LV transformer and into the low voltage mesh as configured in the GP:
Enlighten me please, Esri (or someone else). I cannot see me doing anything wrong here - I might though. Or UN might have a bug?
One thing is for sure - you have a puzzled user.
Solved! Go to Solution.
Hi all,
I am happy to inform you that the BUG-000148077 was fixed with the new version of ArcGIS Enterprise/Pro (11.2 / ArcGIS Pro 3.2)
BUG-000148077 : "The downstream trace across tiers does not reach the target tier in some cases."
Given the fact that the consolidation version for Utility Network is ArcGIS Pro 3.1 could you inform me please on when we may expect a 3.1 patch with this fix.