How to generate a subnetwork for water system intake

392
4
Jump to solution
03-18-2026 12:53 PM
BryanMay531
Regular Contributor

I'm using the Water UN Foundation.  I'm having trouble defining a subnetwork for the system between the intake from a lake and the treatment plant.  From the treatment plant out I have created pressure zone subnetworks but how do I handle from the intake to the treatment plant?

0 Kudos
2 Solutions

Accepted Solutions
RobertKrisher
Esri Regular Contributor

You should be able to define the intake from the lake or the water treatment plan as subnetwork controllers for the Water System tier. This is the highest-level tier in the water network.

View solution in original post

RobertKrisher
Esri Regular Contributor

Can you show a screenshot of the pipes connected to the treatment plant, intake, and the pressure controller? Please include labels for the terminal connections.

If you set the outlet port of the treatment plant as the controller to the system tier, and the subnetwork controller for the pressure tier is downstream of that (and on the downstream terminal of that device) then this shouldn't happen.

View solution in original post

0 Kudos
4 Replies
RobertKrisher
Esri Regular Contributor

You should be able to define the intake from the lake or the water treatment plan as subnetwork controllers for the Water System tier. This is the highest-level tier in the water network.

BryanMay531
Regular Contributor

Ok I got the treatment plant to work as the water system tier controller.  Now the water pressure subnet is leaking through to the intake though.  I tried changing the intake lines to Production asset type but then they get flagged as invalid lines.  How do I get the pressure tier to stop at the Treatment plant?

0 Kudos
RobertKrisher
Esri Regular Contributor

Can you show a screenshot of the pipes connected to the treatment plant, intake, and the pressure controller? Please include labels for the terminal connections.

If you set the outlet port of the treatment plant as the controller to the system tier, and the subnetwork controller for the pressure tier is downstream of that (and on the downstream terminal of that device) then this shouldn't happen.

0 Kudos
BryanMay531
Regular Contributor

I flipped some line directions and got it to work!  thanks!