Hi there,
I am using the VRP solving from Network Analyst for optimized planning of cable routes.
Therefore it is required to assign different costs as exampled below. I have e.g. 6 routes:
- Depot to first stop: 998$/m
- First stop to second stop: 998$m
- 2nd to 3rd:650$/m
- 3rd to 4th: 650$/m
- 4th to 5th: 250$/m
I can't assign those costs to the network edges, as they are dynamically.
Is there a way to assign these costs dynamically to the Routes Layer or someway else in a way that the VRP considers these costs dynamically?
Or could you point me to another solution of this problem?
Thanks and kind regards
Felix