My network consists of 160,000 road segments.
My customer wants to include Stop Signs in the routing logic.
The only way I can think of incorporating Stop Signs is to add them to
a Turn Table. This, however, may not be practical for sustainability.
Is there a better way to incorporate Stop Signs in Network Analyst?
Thanks in advance for your help.
Ron Harris