I am having issues with data stored in a date field in a table used in Field Maps published via ArcGIS Online. I have manually edited the data to reflect the correct date for the records stored in the table (it should be 7/2/2025) and every time I go back to check on the data, it shows up as something else such as 7/3/2025 or 7/1/2025. Anyone else experiencing this issue and what is the resolution?

 

 

 

Tags (2)
0 Kudos
2 Replies
CodyPatterson
MVP Regular Contributor

Hey @JessePinchotFDT 

Which field are you changing? Is it one of the archival fields like Editdate and Creationdate? If so, those may overwrite when edited or be different when created. If this is a custom date field then the data may not be saving properly. Does this happen when you create a new feature with a date, or does this happen only when editing preexisting features?

Cody

0 Kudos
DanGruber
Regular Contributor

We've discovered that in some cases ESRI changes stored dates/times in local time zone to GMT. This happened to us when we downloaded an attribute table as an Excel. You might check whether the incorrect dates/times actually are what you entered converted to GMT.