Select to view content in your preferred language

Harnessing Mobile Data Collection During Construction of a Tailings Embankment | Michael DeVasto – GZA GeoEnvironmental

666
0
07-06-2020 05:59 PM
LaurenceLitrico
Esri Regular Contributor

Michael DeVasto, with GZA GeoEnvironmental, gives an overview of the presentation he recorded for the virtual 2020 Esri User Conference. His presentation will be available to view on-demand, search the conference online agenda with the presentation name.

Abstract submitted:
Construction of a tailings pond embankment is a high-risk endeavor that requires precision at all levels of the project, however during construction, quality control measurements to assess engineering properties of the soil are often recorded on paper and siloed. We deployed Collector for field data collection of quality control tests during construction to alleviate data silos, allow real time data access to stakeholders, and acquire structured data for seamless use in spatial analytics.

0 Kudos
0 Replies