Select to view content in your preferred language

21st Century Infrastructure Project Execution Redefining Phases Utilizing Esri | Kourosh Langari – Caltrans

844
0
07-06-2020 06:22 PM
LaurenceLitrico
Esri Regular Contributor

Kourosh Langari‌, with Caltrans, gives an overview of the presentation he recorded for the virtual 2020 Esri User Conference. His presentation will be available to view on-demand, search the conference online agenda with the presentation name.

Abstract submitted:

In an Integrated Project Delivery (IPD), the project flow from conceptualization through implementation to optimize the project development work flow. California DOT is utilizing IPD work flow, to utilize the emerging technologies such LIDAR point cloud solutions and utilization of Esri ArcGIS Pro Platform to implement Virtual Design Construction (VDC) and can use the Version Manager to create new versions, modify version properties, and delete versions in an enterprise geodatabase.

0 Kudos
0 Replies