Hello all, I am attempting to show offthe power of Network Analsyst to my management. Basically, we have a contract for over 100 sites across six that we need to survey, with each site estimated to take between 0.5 and 5 working days. I need to set up a Vehicle Routing Problem where a single order can be broken up into multiple days (the most realistic model would have them working for 8 hours, then taking a 16 hour break) and they return to the depot at the end of each week, rather than at the end of each day. Has anyone done anything like this that can give me some guidance? Thanks in advance!