Need a way to update a field in AGOL every week. I have a date field that specifies a static date (Ex: Jan 21, 2019) that indicates an inspection date. I want this date to update once a week to show the next scheduled inspection. For example the inspection to occur on Jan 21 will be conducted, but I want the date to update to Jan 28 after that. It will always fall on the same day of the week.
Thanks