I have been given differing opinions on what projection/coordinate system to use in data to be checked out to ArcPad in order for it to run well with Trimble Hardware (GPS PRO 6T Receiver) and Trimble GPS Correct software. I am currently checking out both vector and raster features to ArcPad with usually at least one or more editable point features.
Does it make a difference if you are doing post processing or not? Does all the data have to be checked out in the same projection/coordinate system?
I have had issues with not being able to check-in data from the field - transaction log isn't showing up. Still trying to figure out why.
I am running ArcGIS Desktop 10.1, ArcPad 10 with the latest patch (10.0.04) and the most recent version of Trimble GPS Correct.
Any advice?