Multiple Built-in Tasks

1663
1
Jump to solution
05-26-2014 09:00 PM
HenryKo
New Contributor III
Hi,

Is it possible to have multiple built-in Search Tasks configured for a mobile project?

We want to have two Search Tasks available when user clicks on the Tasks button, so that each of the Search tasks can query for different data (so the first one would be "Search for ABC" and the second one would be "Search for XYZ" when user clicks on the Tasks button).

I was able to edit the .amp file and have two Search Tasks. MPC can see the two Search Tasks, but not the in the ArcGIS for Windows Mobile application. It always picks up the last Search Task entry. Is this by design?

I understand you can configure multiple queries for the built-in Search Task, but user might prefer to have multiple Search Tasks, each has its own query instead.

I am using ArcGIS for Windows Mobile version 10.2.0.0 (build 3581).

Thanks.
0 Kudos
1 Solution

Accepted Solutions
HenryKo
New Contributor III
I believe this is not doable at 10.2.0.0 (build 3581). I had to write custom task to do that instead.

View solution in original post

0 Kudos
1 Reply
HenryKo
New Contributor III
I believe this is not doable at 10.2.0.0 (build 3581). I had to write custom task to do that instead.
0 Kudos