POST
|
hello Community, i have been using ArcGIS pro 2.2.0 on a 64bit windows 7 machine with 32gb Ram for a short time. Basically the calculation runs faster than ArcMap did, but I noticed that there is a maximum of 3gb memory usage per project. When I open more projects they also use about 3gb memory. How can I increase the performance within a single project so that for example 10gb are available for one process? Best regards
... View more
08-23-2019
01:27 AM
|
0
|
0
|
475
|
POST
|
Hello, I have a problem exporting to ArcScene in 2D. As you can see on the pictures, I select a certain point size. However these points are extremely small after the export and therefore unusable. I have already tried extremely large points, but it seems that the size doesn't change. In addition, it seems to be irrelevant how much dpi I specify when exporting, the decisive factor is the number of pixels in the view size. Thanks for the Help Regards
... View more
11-06-2018
06:10 AM
|
0
|
0
|
512
|
POST
|
It worked, thank you Christa. Just as aditional Information: witch transformation should i use for the first x/y-Dateset to get the same results? There is a slide difference between them
... View more
09-04-2018
08:27 AM
|
0
|
1
|
971
|
POST
|
Hello Everyone, i have a (maybe real simple) Problem. I want to add Point Data using X/y-Coordinates based on two different excel-tab. As a basement-layer i use official Data UTM Zone 32 (25832). The first adding is no Problem, die x/y Data is given in N and E collum with Values like: N E 2689100 4337000 2689100 4341100 2690800 4341200 The Documentary says the Data is given in ETRS_1989_LAEA (3035) and its working fine. The second tab now has x/y Data given in that form: N E 4404927,43 5539801,47 4370697,91 5544504,58 4373924,39 5547811,9 I checked the coordinates using web-tools and the point where located at the right spots using Gauss_Zone_3 (31467). But when i want to add this x/y-Data to my projekt there is always a significant cutoff between my first und the secound data: I tryed also different Projektions/Systems but the results stayed the same. Anyone has a idea how to fix this Problem? (iam using ArcGIS 10.5) Best Regards, Sebastian
... View more
09-04-2018
02:25 AM
|
0
|
4
|
1115
|
POST
|
Hello everyone, I want to create a Shapefile (Polygon or Lines) that represent the latitude and longitude of a certain area bassed on the System used form an other Shape. My topic is to split a Country based in 0°30'0'' steps. Thanks for your help.
... View more
05-05-2014
05:47 AM
|
0
|
0
|
472
|
POST
|
Hello, I try to build a Service Area Polygone based on a street Dataset und special Facilities. There is no Problem with those in my opinion. But the way the Polygons Area build are not logic. The Picture below shows that Problem. The Area wich is enclosed by the road is a Mountain without Roads. So why is that part includes bei the Polygon? There are a lot of Areas with that kind of Problem. Every time a Area is surrounded by one or more Roads it is completly covered by the polygon. And it should just use the Parts next to the Roads. Can somebody tell me, which option I have to change? I already tried every typ of polygon Generartion, included the "Trim Polygon" Feature with less than 10 Meters, but nothing happend. (The Image options are: Merge by break value, Deatiled, and Trim on 250 Meter, Ring) I use the 9.2 Version. I hope the problem is clear. Thanks, Sebastian
... View more
04-01-2012
02:28 AM
|
0
|
6
|
2075
|
Online Status |
Offline
|
Date Last Visited |
11-11-2020
02:23 AM
|