I am a Supervisor for a water utility company and have been using Survey123 the last few years to generate data and progress of some programs I created to allow for better asset control. One of the programs I implemented is our Back Flow Prevention program. I created a survey in Survey123 so my operators could perform field inspections on back flow preventers throughout our water system. This is an ongoing yearly project where my employees perform the inspections and with the reports generated based off of the information in the surveys, I am able to send letters to the customers whose BFP's are in rough condition and in need of repair and/or replacement. I have been generating response to the 30 letter I have sent out. What i would like to do is to be able to set an alert or some kind of notification that allows me to notate that the customer has responded, and have complied with the contents of the letter I mailed to them. Is this a possibility? Also, other than exporting the initial surveys, is there a way to move the surveys taken to another file to allow me to start the program over and generate a new round of surveys? I don't want to have 5 surveys for the same address in the survey123 records file. Once I upload testing/inspection reports from the customers, I want to move that initial survey report over to a new file with labeling. Is this Possible? My last question is; if an alert or notification of account update has been completed, is there a way to lock that file so that a new submission isn't allowed so there isn't 5 surveys for that same address or location?
I would appreciate any feed back, I try to save my company as much money as possible. ArcGIS platform helps me do exactly that. So maybe I am using the wrong thing for my program? If so, what solution or program do you recommend that I run by BFP program in. I don't want to have to generate a completely new survey year after year. thanks in advance