
In Survey 123, I am trying to create a survey answer based on the results of previous answers. For example in the image above, a users chooses the priority level and then the day the defect was reported on. The Due Date for completion has to to be limited to 24HRS/1 Week etc from the defect date based on the responses given. I have tried constraints and calculations on Survey 123 connect, but connect get a solution.