Hi, hope u are doing okay.
I’m reaching out regarding an issue reported by one of our clients related to the generation of PDF reports from Survey123 using a Power Automate flow.
The client has a workflow where a job is first created to generate the PDF, and once the job status returns as "Ok", the PDF is then downloaded. This is done through Power Automate by calling endpoints.
Up until June 26th, this process would usually complete in about 30 seconds. Since then, the job status no longer reaches "Ok". Initially, the flow waited up to 5 minutes, and then they increased the wait time to 15 minutes, but the job remains stuck in "executing", and the report is never generated.
The flow hasn't been modified during this period, and they’ve confirmed the issue persists consistently. I've attached a screenshot from their logs showing how long the process used to take before this change.

Could you please help us understand what might be causing this issue? Is anyone else experiencing the same behavior? And could it be that the recent update has introduced a bug or caused this unexpected behavior?
Best regards,
Pili