I've posted a new blog outlining how to Monitor Your Workforce Project Using Operations Dashboard for ArcGIS. Your organization may have additional stakeholders that would like to view the status of ongoing Workforce Projects. In the blog I'll show how to use Operations Dashboard for ArcGIS to create a high level view of an existing Workforce Project. Give the blog a read, then come here to discuss it.
ARe there any plans to incorporate a calendar or gant chart view to Workforce for ArcGIS? We want to implement for assigning staff to specific projects, but need a graphic view that will let us see available staff and move staff from one assignment to another within a calendar view similar to Outlook for example.
Hi Mike,
We do not have any plans for this type of capability at this time.
My suggestion would be to add this to the Ideas site; if others have the same requests that will help us to prioritize this capability.
thanks,
Found this interesting. Is there a way to show the assignments assigned to a worker or the inverse. The Workers who have no assignments? We are using workforce to assign fire incidents at a golf tournament and it would be nice to be able to see those crew members who did not have any assignments. In workforce you can sort by assignment load, but that link does not seem to be in the web map. Below is the Workers Tab from WorkForce
Thanks,
Mele
Hi Mele,
Yes, by configuring actions between the Workers and Assignments layers you can create some pretty powerful and interactive dashboards. For example you could configure a List of Workers. Then you could configure a list of assignments. Then you could add an action to the Category select so that when a worker is selected, it will only show that workers assignments in the list. This could be extended further to filter the other visualizations and map. See below:
I can't think of a way to show the worker load in a dashboard along with the users name. You could create a Serial Chart and groupBy assignments by the "workerId" field. But this doesn't tell you who each workerId is.
Aaron, Thanks for the quick response and giving me some ideas of where to go next. Is the Worker ID something that we could see in the Workers data? I guess what I am wondering is how the assignments are linked to the Worker This sounds promising and I will look into it more tomorrow.
Oh sorry, I meant to include that in the previous reply. You will want to map the workers ObjectID field to the Assignments workerId field when configuring the action between the two layers/visualizations.
Mele,
In addition to what Aaron's outlined, I'd also suggest taking a look at the schema doc for Workforce.
Automate and script Workforce—Workforce for ArcGIS | ArcGIS
That would address your question on:
Is the Worker ID something that we could see in the Workers data?
Craig
Hi Aaron.
I hope you're very well. I have some questions about New Version of Workforce:1.- How can I use the same symbology of Assignments of workforce, as icons in the indicators on operation dashboard?
2.- Another question... The assignmentstype is a field type: GUID, this is unconfortable for show in operation dashboard, this types showed with codes (guid)... is possible change this?
Thank you in advance!
Braulio.
Hi Braulio,
The images used there are the SVGs used by Workforce, I'm not sure if those are publicly available but you might be able to convert them from the symbology using the layers.
For the second question, you'll need to create a joined view layer. We provide a script to generate that since it's quite complicated to build. This will join the layers together so you can access the assignment types, workers, and dispatches in a single live layer. workforce-scripts/create_joined_view.md at master · Esri/workforce-scripts · GitHub
HiIn the last version to ArcGIS Workforce how can I make an operation dashboard where I can add a filter widget to show assignment per worker?
In worker layer WorkerID is a GUID and assigments layer don't have WorkerID
Hi Cesar, Josh has put a new blog post together showing how to do this. Monitor assignment status in ArcGIS Dashboards using a joined Workforce layer
Thanks Aaron
But I want to know which assignment have every worker, in Josh's blog He explains how to join Assignments by Assignment type, My question is diferent, but I'm thinking that is not possible.
Hey Aaron
I'm trying to display which Workforce assignment types are most frequently assigned but the Assignment Type field is populated with a code. Is there a way to convert this code to the string associated with that assignment type's code? How can I display a pie chart of assignments grouped by assignment type?
Hi Aaron,
How can join the Assignment with the Worker, with ArcGis Enterprise. I want to know what assignment is for every worker.
I was checking this link:
Monitor assignment status in ArcGIS Dashboards using a joined Workforce layer (esri.com)
but does´nt work for me.
Thanks in advance.
Hi Cesar:
Could you resolve your issue?
I'm trying to do the same.
Thanks.
I could used in the worker layer the globalid field and the assignments layer the field workerid.
I hope someone will find it useful.
Happy New Year!
We are considering using Workforce for all of our field operations. However, is it possible to see historical data? We would like to extract daily reports from the field worker to know when they started work, took breaks, completed assignments, etc. Is this possible?
Jodie