Up to version 10.5, in the Production Mapping extension, the Event editing toolbar contained the function "Modify shared line events".
The advantage was that adjustments of to- or from-measure field could be edit simultaneously without creating overlaps or gaps to ensure continuity (e.g. pavement condition).
In newer versions this toolbar no longer exists, it is recommended to use R&H.
Is there an equivalent function or handling in R&H?
Thanks