I'm trying to project a raster DEM using the Project Raster tool and at the same time clip the result using the Processing Extent environment option. A bullet in the help system description appears to indicate the output extent will be the same as that of the input raster, but at the bottom of the help Extent is included in the environments.
No matter what Processing Extent I set, the output always has the same extent as the input. Am I missing something in the settings, or does this tool just not allow the use of a processing extent?