The problem is that in the network analysis properties and options of adding "time costs" is not shown as an active.
As a result I can create routing and closest facility using distance costs. But I can not add time costs, consequently I can not use vehicle routing and last mile delivery analysis.
I tried tutorials from esri, they work pretty well. And all NA layer functions work.
My data is simple, it is a network of not existing streets for a student project: polylines (drawn in a write way), having object id, classification, length, speed, travel time. They have coordinates, projected.
What is missing? Why I can not use time costs in analysis? (If it is relevant - elevations I switched off by creating NA layer)
Thanks in advance for a help.