Hi, im currently modeling a part of a bassin, to do so i need to run the stream order tool but unfortunately it is stuck on 8%. It has never happened until now. Any ideas on how to fix the issue?
Well, if it is a big raster and highly braided it may take a long time.
An cell size is 1 meter I presume, which means your inputs and outputs are in the same projected coordinate system (?) If not, then a lot of work has to be done.
Work locally with locally stored data is the number 1 rule.
Sure thing, i haven't done a coordinate transformation, i use the default cell size of 'Maximum as input' which is 1. Also, i use the extent of my input stream raster and i have checked the pyramide option (with 'neaerest' as resampling option). Should i aggregate the raster to a lower resolution? Finaly, it is stuck on 'updating stream order'
Stream Order (Spatial Analyst)—ArcGIS Pro | Documentation
in the Environments section for the tool, there is a big list of the things that could affect the processing, so perhaps you could elaborate on a few things, like whether there is any coordinate conversions going on, the cell size, the extent of the input data , etc
Aangemelde leden kunnen berichten plaatsen, updates volgen en meer. Nieuw hier? Registreer een gratis account.
Find useful guides, FAQs, and documents to help you navigate and make the most of Esri Community.