I am using ArcGIS Pro 'Project Raster' to convert a projected raster to GCS. The raster is a crop data layer using: USA Contiguous Albers Equal Area Conic USGS Version with a spheroid of GRS 1980 and datum of NAD83. It has a resolution of 30meters. I would like to re-project this raster to World Geodetic System 1984 (WGS84).
My question is for the Project Raster cell size field, do I enter '30' (30 meters) -Or- leave the cell size field blank and run the tool.
Thank you for your time,
Chris