It would be nice to be able to set a calculation rule to pull data into a point layer from an upstream line layer. I want to pull the data from my upstream water / sanitary / and storm water lines and populate the downstream point layers. In attribute assistant you were able to do the to and from. Can you do that in attribute rule?