I need some ideas on how to design my Survey123 to where staff can track their time on-site & equipment time on site.
In a previous survey, I made a ${EmployeesOnSite} and ${EquipmentOnSite} question to where staff can select the employees/equipment on-site (select multiple)
Then created a question/field for each employee's & equipment's total time from those lists.
Example:
${JohnSmithTotalTime}
${JohnSpatialTotalTime}
${GeoJennyTotalTime}
${GISTruckTotalTime}
${87995TotalTime}
Using a couple of calculations and relevant functions I was able to make this work.
I want to avoid using this method for this Survey. (A lot more staff and equipment to choose from)
Data is currently collected in a paper form then migrated into an excel sheet like below.
Staff would like to use Survey123 to track their work and the number of hours each available employee was on-site and equipment used.
Any ideas on how to design this workflow?
Thanks,
