Hi all,
I am processing a terrain following the ESRI manual "Overview of Arc Hydro Terrain Preprocessing Workflows". More specifically I'm using case 8: Completely dendritic terrain with known stream locations (using synthetic streams).
I have a stream feature class that I first pass through "Create Drainage Line Structures" (as specified in the manual). I then fill sinks and run "DEM reconditioning from stream grid" using the stream grid created in the previous process.
From here I simply follow the manual (case 8 as I specified above).
What I noticed is that in comparison to case 9 (Completely dendritic terrain with known stream locations (using user specified streams)) in case 8 it is not needed Adjust Flow Direction in Streams.
Could someone please confirm this is correct and possibly explain why this is the case?
Thanks so much.
Alex.