- currently approx. 5-10 simustaneous field data collectors
- current SQL Server Express instance with all SDE gdbs is ~5GB
- current ArcGIS for Server 10.3.1 Standard Workgroup; 2-core license
- current Win Server 2008 x64 8GB RAM box functions as:
- 5TB RAID5 array that stores all SQL db data/logs, and also file data that's shared via SMB
- runs ArcGIS for Server
- runs IIS7 web adaptor
- current published feat. services as added as peroxided items in AGOL
- current box is always running at 97%+ physical memory, we need more memory and I also want SQL server to utilize more then 1GB of memory, hence the upgrade to Standard.
New box. 6-core, 32GB RAM
- old GIS box will continue to be file server
- new box will run Hyper-V Core as host OS, with 2 guest VM's, each will be Server 2012 Std:
- VM-1
- Active Directory Domain Controller
- SQL Server 2012 Std
- VM-2
- ArcGIS for Server 10.5 Standard Workgroup; 2-core
- ArcGIS Web Adapter on IIS7
- Active Directory Domain Controller
How should I configure the physical drives in the new box; how about his?
- Single physical 60GB SSD 7.2K RPM drive for host OS, Hyper-V Core (I don't want to go down the thumb drive route)
- One Big Raid10 array with 4x500GB SSD 10k RPM physical drives = 1000GB of space.
- VM-1_OS.vhd -- OS (120GB)
- VM-1_SQLdata.vhd -- SQL Server Data (500GB)
- VM-1_SQLlog.vhd -- SQL Server Logs (200GB)
- VM-2_OS.vhd -- OS and ArcGIS Server and AD DC (120GB)
Edit: looks like DC's are incompotible with both SQL server and ArcGIS Server. I'll find a different solution for it. Too bad MS Server 2012 R2 Std didn't come with more then 2 VM licenses...We just cannot justify the datacenter edition price.