I am updating subnetworks in my arcgis water utility network, I set the downstream line connected to the controller to be connected to Downstream Terminal of the controller, since the digitizing direction was towards the controller, I had to select downstream terminal in the TOTERMINAL Attribute of the connected line, the subnetwork proceeded. But it stops at locations where there is another line connected to this first line via a fitting junction feature. Both lines are snapped and there are appropriate rules to allow connectivity and there is no dirty area as well. The second line is not connected to any terminalled device so None in both FROMTERMINAL and TOTERMINAL attributes. This happens at both scenarios where The second line is digitized in same direction as the first and when they are in opposite directions as well.
Why does subnetwork stop there.