What I am trying to do is theoretically very simple but once try clicking "start" in field maps to start the task, I keep getting stuck in a loop between the layout filters and calculated expressions in ArcGIS Field Maps Designer. All I am trying to do is have the esritask_assignee be a required field and have the esritask_status field automatically calculate as assigned once the user selects an assignee. It doesn't make sense for the user to have to switch the status to assigned manually when they pick an assignee in the same form. What is the correct configuration to do this? I don't need the ability to have any tasks be unassigned at all. I also didn't add anything different from the default configuration that they offer when you enable tasks on a layer.