As I develop the asset package, I have drawn Lift Station polygons and Wet Well polygons in accurate locations. For containment to be built in the Utility Network, do the valves and pumps etc need to be in geographically accurate positions or is that handled in the process of applying the asset package?
In the attached photo, the valves, pumps and pipes are as we have them drawn now, but would be more accurately be drawn in a smaller area next to the Wet well.