Hi Community!
I'm in a dilemma at work.
long story short, I was hired as a fresh graduate in as a one person department to oversee the establishment and implementation of GIS in the institution. Our data originally was in CAD format and vary from plots containing investors data and infrastructure networks (Basically a masterplan) which are located in blocks across the entire country which means that our assets fall in different zones in terms of coordinate systems.
That is why our consultant made 13 different Enterprise SDE GDBs, which caused a lot of problems managing the entire thing instead of a single unified GDB.
They keep arguing that it is not possible to upload and merge all CAD drawings and data without causing problems in the positional accuracy of the data.
I need your help strengthening our argument or better solutions to finally come out with an accurate single GDB to rely on in our future work.
Thank you in advance and sorry for the long post.
kind regards,,,