In a QC project, required horizontal accuracy is set to x meters. When after successfully starting capture of a track for a period of time this limit is not met, the last and again first points within the limit are connected by a straight line, which of course does not correspond at all to the actual track. Any suggestions how to resolve this? Interrupting the track line would be adequate, this then would be a multipart feature ...? Any other ideas? Thanks!