We have a lot of GIS data and an example of one issue is sewer pipe connections. We use one standard approach of pipes connect directly to manholes.
In UN the Manhole is a container with 2 pipe connection points, the pipes actually connect to the connection points and not the manhole. Ok, I see the logic in the construction technique. But how are people porting thousand of existing manhole/pipe connections from geometric network into utility network?
The load will bring in the old construction method (pipes connect to manhole) which is not proper build for UN. Does each manhole have to be visited, post load, and manually rebuilt as container with 2 pipe connection points and then snap lines to those points?