We are trying to create MapPoints along a line at a set interval of feet or meters. We have attempted changing the projection of the line and points while generating points every 1000 ft., but no matter what we do with the projection our points are off by 10 - 60 ft.
We are using the GeometryEngine.Instance.MovePointAlongLine method.
How can we accurately place a point every 1000 ft along a line?