I was going through the currently listed bugs for Pro 3.5/3.5.1 and found this one that will be fixed in 3.6.

Knowing that our State is migrating to Parcel Fabric, it made me wonder about the approach to keep fixing bugs in the next version of Pro rather than the one the bug was found in. I felt it became more prevalent in 3.4 which had a few niggles, that were fixed in 3.5, which then introduces its own new bugs.
As Pro point versions seem to be quite unstable currently (from a *nix feature change perspective, not just 'it may crash'), it is getting quite hard to plan processes & workflows from a long term point of view.
You can spend time/money to streamline a workflow in a specific version but then run into a showstopper bug.
What do you do now? A new version comes out that fixes the bug but also introduces a shiny new feature that replaces part of your process in a way that you cannot incorporate without re-doing a lot of work.
This is aside from the potential for significant bugs in the X.Y.0 version.
How valid is it to think that the release model should change to a mix of Long Term Stable + New Feature Releases Short Term Unstable?
If you think it has merit please upvote the Idea:
https://community.esri.com/t5/arcgis-pro-ideas/change-pro-development-to-use-a-more-conservative/idi-p/1547856