I am working with the Electric Distribution Management GDB from Arc Solutions and slowly trying to add my Electric Data from my current GDB to the Utility Network. Working thru all of the errors but one I cannot figure out is connecting an Overhead Medium Conductor and an Underground Medium Conductor. I have an Electric Junction (Medium Voltage Attachment-Riser) and when I run the Update Subnetwork tool, it does not connect the Overhead to Underground. I have even done the connectivity on connecting the conductor to the junction still with no luck on updating the Electric Subnet Line layer.
Any advice on what I might be doing wrong??