Hi, All
I have a problem of using BIM file to Geodatabase. The problem is that after updating pro 2.6, BIM file to geodatabase is too slow to use the tool. i check the my system requirement and BIM file, but they are collect. Also, the BIM file size is not a big data. the data size is 37,560KB(It is almost 400MB). Someone says 400MB is big data, but i have a experience of updating 1GB BIM file on ArcGIS Pro 2.5. Anyway, does anyone know why BIM file to geodatabase tool is too slow to convert BIM file? currently, I am