Hello all,
I'm currently building this massive survey and when complete, it will be close to 1000 lines. Within it, there are multiple components including six inspection forms and six other surveys. If I need to make a change to the schema, there is a potential that I could loose all the data in the other components of this survey and it also becomes an administration nightmare, however I want to make it easy for the field workers to do their inspections.
Ideally, I would like to see if I can have all those surveys as individual surveys and the parent survey can call the child surveys, when the field work requires them.
Is this possible?
Attached is a screen shot of the main survey.
This would help with reporting components and also the maintenance of the surveys.
Paul
ArcGIS Survey123, Esri Surveying