I have tried using the below in my initial query, and query right before drawing my polygons with class breaks.
query.orderByFields = ["Shape__Area DESC"];
However this did not seem to do anything. I have also tried using grid_value field as well.
You can see in the screenshot a 3.8 grid value polygon overlapping making the inner 6.5 and 7.8 grid_value polygons in accessible to click.

Here is my relevant code in which I am querying and then doing the drawing... main problem is occasionally large polygons block out smaller ones.. I can mostly see them, but visibility is not the issue.. I need to be able to click them as well.. if the smaller polygons would draw on top most layer, or even higher grid values on top should solve it. I found orderByFields in the docs but doesn't seem to do anything at all...
query<SPAN class="punctuation token">.</SPAN>outFields <SPAN class="operator token">=</SPAN> <SPAN class="punctuation token">[</SPAN><SPAN class="string token">"*"</SPAN><SPAN class="punctuation token">]</SPAN><SPAN class="punctuation token">;</SPAN>
<SPAN class="comment token">//query.orderByFields = ["Shape__Area DESC"];</SPAN>
query<SPAN class="punctuation token">.</SPAN>returnDistinctValues <SPAN class="operator token">=</SPAN> <SPAN class="keyword token">false</SPAN><SPAN class="punctuation token">;</SPAN>
query<SPAN class="punctuation token">.</SPAN>returnGeometry <SPAN class="operator token">=</SPAN> <SPAN class="keyword token">true</SPAN><SPAN class="punctuation token">;</SPAN>
QT<SPAN class="punctuation token">.</SPAN><SPAN class="token function">execute</SPAN><SPAN class="punctuation token">(</SPAN>query<SPAN class="punctuation token">)</SPAN><SPAN class="punctuation token">.</SPAN><SPAN class="token function">then</SPAN><SPAN class="punctuation token">(</SPAN><SPAN class="keyword token">function</SPAN> <SPAN class="punctuation token">(</SPAN>evt<SPAN class="punctuation token">)</SPAN> <SPAN class="punctuation token">{</SPAN>
evt<SPAN class="punctuation token">.</SPAN>features<SPAN class="punctuation token">.</SPAN><SPAN class="token function">forEach</SPAN><SPAN class="punctuation token">(</SPAN><SPAN class="keyword token">function</SPAN> <SPAN class="punctuation token">(</SPAN>feature<SPAN class="punctuation token">)</SPAN> <SPAN class="punctuation token">{</SPAN>
<SPAN class="keyword token">var</SPAN> att <SPAN class="operator token">=</SPAN> feature<SPAN class="punctuation token">.</SPAN>attributes
<SPAN class="keyword token">var</SPAN> test <SPAN class="operator token">=</SPAN> geometryEngine<SPAN class="punctuation token">.</SPAN><SPAN class="token function">convexHull</SPAN><SPAN class="punctuation token">(</SPAN>feature<SPAN class="punctuation token">.</SPAN>geometry<SPAN class="punctuation token">)</SPAN>
<SPAN class="keyword token">var</SPAN> genpoly <SPAN class="operator token">=</SPAN> <SPAN class="keyword token">null</SPAN>
<SPAN class="keyword token">if</SPAN> <SPAN class="punctuation token">(</SPAN>att<SPAN class="punctuation token">.</SPAN>grid_value <SPAN class="operator token"><=</SPAN> <SPAN class="number token">4.0</SPAN><SPAN class="punctuation token">)</SPAN> <SPAN class="punctuation token">{</SPAN>
<SPAN class="keyword token">var</SPAN> rad <SPAN class="operator token">=</SPAN> att<SPAN class="punctuation token">.</SPAN>Shape__Length <SPAN class="operator token">/</SPAN> <SPAN class="number token">75</SPAN>
genpoly <SPAN class="operator token">=</SPAN> <SPAN class="keyword token">new</SPAN> <SPAN class="token class-name">Circle</SPAN><SPAN class="punctuation token">(</SPAN><SPAN class="punctuation token">{</SPAN>
center<SPAN class="punctuation token">:</SPAN> test<SPAN class="punctuation token">.</SPAN>centroid<SPAN class="punctuation token">,</SPAN>
radius<SPAN class="punctuation token">:</SPAN> rad<SPAN class="punctuation token">,</SPAN>
radiusUnit<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"meters"</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">)</SPAN>
<SPAN class="punctuation token">}</SPAN> <SPAN class="keyword token">else</SPAN> <SPAN class="punctuation token">{</SPAN>
genpoly <SPAN class="operator token">=</SPAN> test
<SPAN class="punctuation token">}</SPAN>
<SPAN class="keyword token">var</SPAN> polygonGraphic <SPAN class="operator token">=</SPAN> <SPAN class="keyword token">new</SPAN> <SPAN class="token class-name">Graphic</SPAN><SPAN class="punctuation token">(</SPAN><SPAN class="punctuation token">{</SPAN>
geometry<SPAN class="punctuation token">:</SPAN> genpoly<SPAN class="punctuation token">,</SPAN>
attributes<SPAN class="punctuation token">:</SPAN> att<SPAN class="punctuation token">,</SPAN>
type<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"polygon"</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">)</SPAN><SPAN class="punctuation token">;</SPAN>
gras<SPAN class="punctuation token">.</SPAN><SPAN class="token function">push</SPAN><SPAN class="punctuation token">(</SPAN>polygonGraphic<SPAN class="punctuation token">)</SPAN><SPAN class="punctuation token">;</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">)</SPAN><SPAN class="punctuation token">;</SPAN>
<SPAN class="keyword token">var</SPAN> renderer <SPAN class="operator token">=</SPAN> <SPAN class="punctuation token">{</SPAN>
type<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"class-breaks"</SPAN><SPAN class="punctuation token">,</SPAN>
field<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"grid_value"</SPAN><SPAN class="punctuation token">,</SPAN>
classificationMethod<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"esriClassifyManual"</SPAN><SPAN class="punctuation token">,</SPAN>
classBreakInfos<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">[</SPAN><SPAN class="punctuation token">{</SPAN>
minValue<SPAN class="punctuation token">:</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN>
maxValue<SPAN class="punctuation token">:</SPAN> <SPAN class="number token">1.9999</SPAN><SPAN class="punctuation token">,</SPAN>
symbol<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">{</SPAN>
color<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">[</SPAN><SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">]</SPAN><SPAN class="punctuation token">,</SPAN>
outline<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">{</SPAN>
color<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">[</SPAN><SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">]</SPAN><SPAN class="punctuation token">,</SPAN>
width<SPAN class="punctuation token">:</SPAN> <SPAN class="number token">0.4</SPAN><SPAN class="punctuation token">,</SPAN>
type<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"simple-line"</SPAN><SPAN class="punctuation token">,</SPAN>
style<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"solid"</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">,</SPAN>
type<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"simple-fill"</SPAN><SPAN class="punctuation token">,</SPAN>
style<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"solid"</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">,</SPAN>
label<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"I (Not Felt)"</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">,</SPAN>
<SPAN class="punctuation token">{</SPAN>
minValue<SPAN class="punctuation token">:</SPAN> <SPAN class="number token">2.0</SPAN><SPAN class="punctuation token">,</SPAN>
maxValue<SPAN class="punctuation token">:</SPAN> <SPAN class="number token">3.0</SPAN><SPAN class="punctuation token">,</SPAN>
symbol<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">{</SPAN>
color<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">[</SPAN><SPAN class="number token">191</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">204</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">255</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="punctuation token">.</SPAN><SPAN class="number token">3</SPAN><SPAN class="punctuation token">]</SPAN><SPAN class="punctuation token">,</SPAN>
outline<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">{</SPAN>
color<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">[</SPAN><SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">]</SPAN><SPAN class="punctuation token">,</SPAN>
width<SPAN class="punctuation token">:</SPAN> <SPAN class="number token">0.4</SPAN><SPAN class="punctuation token">,</SPAN>
type<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"simple-line"</SPAN><SPAN class="punctuation token">,</SPAN>
style<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"solid"</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">,</SPAN>
type<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"simple-fill"</SPAN><SPAN class="punctuation token">,</SPAN>
style<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"solid"</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">,</SPAN>
label<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"II (Weak)"</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">,</SPAN>
<SPAN class="punctuation token">{</SPAN>
minValue<SPAN class="punctuation token">:</SPAN> <SPAN class="number token">3.1</SPAN><SPAN class="punctuation token">,</SPAN>
maxValue<SPAN class="punctuation token">:</SPAN> <SPAN class="number token">3.9</SPAN><SPAN class="punctuation token">,</SPAN>
symbol<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">{</SPAN>
color<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">[</SPAN><SPAN class="number token">153</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">153</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">255</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="punctuation token">.</SPAN><SPAN class="number token">4</SPAN><SPAN class="punctuation token">]</SPAN><SPAN class="punctuation token">,</SPAN>
outline<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">{</SPAN>
color<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">[</SPAN><SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">]</SPAN><SPAN class="punctuation token">,</SPAN>
width<SPAN class="punctuation token">:</SPAN> <SPAN class="number token">0.4</SPAN><SPAN class="punctuation token">,</SPAN>
type<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"simple-line"</SPAN><SPAN class="punctuation token">,</SPAN>
style<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"solid"</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">,</SPAN>
type<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"simple-fill"</SPAN><SPAN class="punctuation token">,</SPAN>
style<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"solid"</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">,</SPAN>
label<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"III (Weak)"</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">,</SPAN>
<SPAN class="punctuation token">{</SPAN>
minValue<SPAN class="punctuation token">:</SPAN> <SPAN class="number token">4.0</SPAN><SPAN class="punctuation token">,</SPAN>
maxValue<SPAN class="punctuation token">:</SPAN> <SPAN class="number token">4.5</SPAN><SPAN class="punctuation token">,</SPAN>
symbol<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">{</SPAN>
color<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">[</SPAN><SPAN class="number token">136</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">255</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">255</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">1</SPAN><SPAN class="punctuation token">]</SPAN><SPAN class="punctuation token">,</SPAN>
outline<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">{</SPAN>
color<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">[</SPAN><SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">]</SPAN><SPAN class="punctuation token">,</SPAN>
width<SPAN class="punctuation token">:</SPAN> <SPAN class="number token">0.4</SPAN><SPAN class="punctuation token">,</SPAN>
type<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"simple-line"</SPAN><SPAN class="punctuation token">,</SPAN>
style<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"solid"</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">,</SPAN>
type<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"simple-fill"</SPAN><SPAN class="punctuation token">,</SPAN>
style<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"solid"</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">,</SPAN>
label<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"IV (Light)"</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">,</SPAN>
<SPAN class="punctuation token">{</SPAN>
minValue<SPAN class="punctuation token">:</SPAN> <SPAN class="number token">4.5</SPAN><SPAN class="punctuation token">,</SPAN>
maxValue<SPAN class="punctuation token">:</SPAN> <SPAN class="number token">4.9999</SPAN><SPAN class="punctuation token">,</SPAN>
symbol<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">{</SPAN>
color<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">[</SPAN><SPAN class="number token">125</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">248</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">148</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">1</SPAN><SPAN class="punctuation token">]</SPAN><SPAN class="punctuation token">,</SPAN>
outline<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">{</SPAN>
color<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">[</SPAN><SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">]</SPAN><SPAN class="punctuation token">,</SPAN>
width<SPAN class="punctuation token">:</SPAN> <SPAN class="number token">0.4</SPAN><SPAN class="punctuation token">,</SPAN>
type<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"simple-line"</SPAN><SPAN class="punctuation token">,</SPAN>
style<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"solid"</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">,</SPAN>
type<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"simple-fill"</SPAN><SPAN class="punctuation token">,</SPAN>
style<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"solid"</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">,</SPAN>
label<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"V (Light)"</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">,</SPAN>
<SPAN class="punctuation token">{</SPAN>
minValue<SPAN class="punctuation token">:</SPAN> <SPAN class="number token">6.0</SPAN><SPAN class="punctuation token">,</SPAN>
maxValue<SPAN class="punctuation token">:</SPAN> <SPAN class="number token">6.9999</SPAN><SPAN class="punctuation token">,</SPAN>
symbol<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">{</SPAN>
color<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">[</SPAN><SPAN class="number token">255</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">255</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">1</SPAN><SPAN class="punctuation token">]</SPAN><SPAN class="punctuation token">,</SPAN>
outline<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">{</SPAN>
color<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">[</SPAN><SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">]</SPAN><SPAN class="punctuation token">,</SPAN>
width<SPAN class="punctuation token">:</SPAN> <SPAN class="number token">0.4</SPAN><SPAN class="punctuation token">,</SPAN>
type<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"simple-line"</SPAN><SPAN class="punctuation token">,</SPAN>
style<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"solid"</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">,</SPAN>
type<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"simple-fill"</SPAN><SPAN class="punctuation token">,</SPAN>
style<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"solid"</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">,</SPAN>
label<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"VI (Strong)"</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">,</SPAN>
<SPAN class="punctuation token">{</SPAN>
minValue<SPAN class="punctuation token">:</SPAN> <SPAN class="number token">7.0</SPAN><SPAN class="punctuation token">,</SPAN>
maxValue<SPAN class="punctuation token">:</SPAN> <SPAN class="number token">7.9999</SPAN><SPAN class="punctuation token">,</SPAN>
symbol<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">{</SPAN>
color<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">[</SPAN><SPAN class="number token">255</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">221</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">1</SPAN><SPAN class="punctuation token">]</SPAN><SPAN class="punctuation token">,</SPAN>
outline<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">{</SPAN>
color<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">[</SPAN><SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">]</SPAN><SPAN class="punctuation token">,</SPAN>
width<SPAN class="punctuation token">:</SPAN> <SPAN class="number token">0.4</SPAN><SPAN class="punctuation token">,</SPAN>
type<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"simple-line"</SPAN><SPAN class="punctuation token">,</SPAN>
style<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"solid"</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">,</SPAN>
type<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"simple-fill"</SPAN><SPAN class="punctuation token">,</SPAN>
style<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"solid"</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">,</SPAN>
label<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"VII (Very Strong)"</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">,</SPAN>
<SPAN class="punctuation token">{</SPAN>
minValue<SPAN class="punctuation token">:</SPAN> <SPAN class="number token">8.0</SPAN><SPAN class="punctuation token">,</SPAN>
maxValue<SPAN class="punctuation token">:</SPAN> <SPAN class="number token">8.9999</SPAN><SPAN class="punctuation token">,</SPAN>
symbol<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">{</SPAN>
color<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">[</SPAN><SPAN class="number token">255</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">145</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">1</SPAN><SPAN class="punctuation token">]</SPAN><SPAN class="punctuation token">,</SPAN>
outline<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">{</SPAN>
color<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">[</SPAN><SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">]</SPAN><SPAN class="punctuation token">,</SPAN>
width<SPAN class="punctuation token">:</SPAN> <SPAN class="number token">0.4</SPAN><SPAN class="punctuation token">,</SPAN>
type<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"simple-line"</SPAN><SPAN class="punctuation token">,</SPAN>
style<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"solid"</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">,</SPAN>
type<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"simple-fill"</SPAN><SPAN class="punctuation token">,</SPAN>
style<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"solid"</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">,</SPAN>
label<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"VIII (Severe) "</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">,</SPAN>
<SPAN class="punctuation token">{</SPAN>
minValue<SPAN class="punctuation token">:</SPAN> <SPAN class="number token">9.0</SPAN><SPAN class="punctuation token">,</SPAN>
maxValue<SPAN class="punctuation token">:</SPAN> <SPAN class="number token">9.9999</SPAN><SPAN class="punctuation token">,</SPAN>
symbol<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">{</SPAN>
color<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">[</SPAN><SPAN class="number token">255</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">1</SPAN><SPAN class="punctuation token">]</SPAN><SPAN class="punctuation token">,</SPAN>
outline<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">{</SPAN>
color<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">[</SPAN><SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">]</SPAN><SPAN class="punctuation token">,</SPAN>
width<SPAN class="punctuation token">:</SPAN> <SPAN class="number token">0.4</SPAN><SPAN class="punctuation token">,</SPAN>
type<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"simple-line"</SPAN><SPAN class="punctuation token">,</SPAN>
style<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"solid"</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">,</SPAN>
type<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"simple-fill"</SPAN><SPAN class="punctuation token">,</SPAN>
style<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"solid"</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">,</SPAN>
label<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"IX (Violent)"</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">,</SPAN>
<SPAN class="punctuation token">{</SPAN>
minValue<SPAN class="punctuation token">:</SPAN> <SPAN class="number token">10.0</SPAN><SPAN class="punctuation token">,</SPAN>
maxValue<SPAN class="punctuation token">:</SPAN> <SPAN class="number token">10.9999</SPAN><SPAN class="punctuation token">,</SPAN>
symbol<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">{</SPAN>
color<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">[</SPAN><SPAN class="number token">221</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">1</SPAN><SPAN class="punctuation token">]</SPAN><SPAN class="punctuation token">,</SPAN>
outline<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">{</SPAN>
color<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">[</SPAN><SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">]</SPAN><SPAN class="punctuation token">,</SPAN>
width<SPAN class="punctuation token">:</SPAN> <SPAN class="number token">0.4</SPAN><SPAN class="punctuation token">,</SPAN>
type<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"simple-line"</SPAN><SPAN class="punctuation token">,</SPAN>
style<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"solid"</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">,</SPAN>
type<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"simple-fill"</SPAN><SPAN class="punctuation token">,</SPAN>
style<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"solid"</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">,</SPAN>
label<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"X"</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">,</SPAN>
<SPAN class="punctuation token">{</SPAN>
minValue<SPAN class="punctuation token">:</SPAN> <SPAN class="number token">11.0</SPAN><SPAN class="punctuation token">,</SPAN>
maxValue<SPAN class="punctuation token">:</SPAN> <SPAN class="number token">11.9999</SPAN><SPAN class="punctuation token">,</SPAN>
symbol<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">{</SPAN>
color<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">[</SPAN><SPAN class="number token">136</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">1</SPAN><SPAN class="punctuation token">]</SPAN><SPAN class="punctuation token">,</SPAN>
outline<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">{</SPAN>
color<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">[</SPAN><SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">]</SPAN><SPAN class="punctuation token">,</SPAN>
width<SPAN class="punctuation token">:</SPAN> <SPAN class="number token">0.4</SPAN><SPAN class="punctuation token">,</SPAN>
type<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"simple-line"</SPAN><SPAN class="punctuation token">,</SPAN>
style<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"solid"</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">,</SPAN>
type<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"simple-fill"</SPAN><SPAN class="punctuation token">,</SPAN>
style<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"solid"</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">,</SPAN>
label<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"XI"</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">,</SPAN>
<SPAN class="punctuation token">{</SPAN>
minValue<SPAN class="punctuation token">:</SPAN> <SPAN class="number token">12.0</SPAN><SPAN class="punctuation token">,</SPAN>
maxValue<SPAN class="punctuation token">:</SPAN> <SPAN class="number token">12.0</SPAN><SPAN class="punctuation token">,</SPAN>
symbol<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">{</SPAN>
color<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">[</SPAN><SPAN class="number token">68</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">1</SPAN><SPAN class="punctuation token">]</SPAN><SPAN class="punctuation token">,</SPAN>
outline<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">{</SPAN>
color<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">[</SPAN><SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">]</SPAN><SPAN class="punctuation token">,</SPAN>
width<SPAN class="punctuation token">:</SPAN> <SPAN class="number token">0.4</SPAN><SPAN class="punctuation token">,</SPAN>
type<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"simple-line"</SPAN><SPAN class="punctuation token">,</SPAN>
style<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"solid"</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">,</SPAN>
type<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"simple-fill"</SPAN><SPAN class="punctuation token">,</SPAN>
style<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"solid"</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">,</SPAN>
label<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"XII"</SPAN>
<SPAN class="punctuation token">}</SPAN>
<SPAN class="punctuation token">]</SPAN>
<SPAN class="punctuation token">}</SPAN>
<SPAN class="keyword token">var</SPAN> popupTrails <SPAN class="operator token">=</SPAN> <SPAN class="punctuation token">{</SPAN>
outFields<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">[</SPAN><SPAN class="string token">"*"</SPAN><SPAN class="punctuation token">]</SPAN><SPAN class="punctuation token">,</SPAN>
<SPAN class="string token">"title"</SPAN><SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"Shake ID: {id}"</SPAN><SPAN class="punctuation token">,</SPAN>
<SPAN class="string token">"content"</SPAN><SPAN class="punctuation token">:</SPAN> <SPAN class="keyword token">function</SPAN> <SPAN class="punctuation token">(</SPAN>feature<SPAN class="punctuation token">)</SPAN><SPAN class="punctuation token">{</SPAN>
<SPAN class="keyword token">let</SPAN> name_plc<SPAN class="punctuation token">;</SPAN>
<SPAN class="keyword token">let</SPAN> dlv <SPAN class="operator token">=</SPAN> document<SPAN class="punctuation token">.</SPAN><SPAN class="token function">createElement</SPAN><SPAN class="punctuation token">(</SPAN><SPAN class="string token">"div"</SPAN><SPAN class="punctuation token">)</SPAN><SPAN class="punctuation token">;</SPAN>
dlv<SPAN class="punctuation token">.</SPAN>className <SPAN class="operator token">=</SPAN> <SPAN class="string token">"popd"</SPAN><SPAN class="punctuation token">;</SPAN>
dlv<SPAN class="punctuation token">.</SPAN>innerHTML <SPAN class="operator token">=</SPAN> `<SPAN class="operator token"><</SPAN>b<SPAN class="operator token">></SPAN><SPAN class="operator token"><</SPAN>span <SPAN class="keyword token">class</SPAN><SPAN class="operator token">=</SPAN><SPAN class="string token">'name_plc'</SPAN><SPAN class="operator token">></SPAN><SPAN class="operator token"><</SPAN><SPAN class="operator token">/</SPAN>span<SPAN class="operator token">></SPAN><SPAN class="operator token"><</SPAN><SPAN class="operator token">/</SPAN>b<SPAN class="operator token">></SPAN><SPAN class="operator token"><</SPAN>br<SPAN class="operator token">></SPAN>ID<SPAN class="punctuation token">:</SPAN> <SPAN class="operator token"><</SPAN>span <SPAN class="keyword token">class</SPAN><SPAN class="operator token">=</SPAN><SPAN class="string token">"ida"</SPAN><SPAN class="operator token">></SPAN>$<SPAN class="punctuation token">{</SPAN>feature<SPAN class="punctuation token">.</SPAN>graphic<SPAN class="punctuation token">.</SPAN>attributes<SPAN class="punctuation token">.</SPAN>id<SPAN class="punctuation token">}</SPAN><SPAN class="operator token"><</SPAN><SPAN class="operator token">/</SPAN>span<SPAN class="operator token">></SPAN><SPAN class="operator token"><</SPAN>br<SPAN class="operator token">></SPAN> URL<SPAN class="punctuation token">:</SPAN> <SPAN class="operator token"><</SPAN>a href<SPAN class="operator token">=</SPAN><SPAN class="string token">"${feature.graphic.attributes.url}"</SPAN> target<SPAN class="operator token">=</SPAN><SPAN class="string token">"_blank"</SPAN><SPAN class="operator token">></SPAN>View<SPAN class="operator token"><</SPAN><SPAN class="operator token">/</SPAN>a<SPAN class="operator token">></SPAN> <SPAN class="operator token"><</SPAN>br<SPAN class="operator token">></SPAN> Updated<SPAN class="punctuation token">:</SPAN> $<SPAN class="punctuation token">{</SPAN>feature<SPAN class="punctuation token">.</SPAN>graphic<SPAN class="punctuation token">.</SPAN>attributes<SPAN class="punctuation token">.</SPAN>updated<SPAN class="punctuation token">}</SPAN> <SPAN class="operator token"><</SPAN>br<SPAN class="operator token">></SPAN>Grid_value<SPAN class="punctuation token">:</SPAN> $<SPAN class="punctuation token">{</SPAN>feature<SPAN class="punctuation token">.</SPAN>graphic<SPAN class="punctuation token">.</SPAN>attributes<SPAN class="punctuation token">.</SPAN>grid_value<SPAN class="punctuation token">}</SPAN><SPAN class="operator token"><</SPAN>br<SPAN class="operator token">></SPAN> Event Time<SPAN class="punctuation token">:</SPAN> $<SPAN class="punctuation token">{</SPAN>feature<SPAN class="punctuation token">.</SPAN>graphic<SPAN class="punctuation token">.</SPAN>attributes<SPAN class="punctuation token">.</SPAN>eventTime<SPAN class="punctuation token">}</SPAN> <SPAN class="operator token"><</SPAN>style<SPAN class="operator token">></SPAN><SPAN class="punctuation token">.</SPAN>esri<SPAN class="operator token">-</SPAN>popup__navigation <SPAN class="punctuation token">{</SPAN> display<SPAN class="punctuation token">:</SPAN> none<SPAN class="punctuation token">;</SPAN><SPAN class="punctuation token">}</SPAN><SPAN class="operator token"><</SPAN><SPAN class="operator token">/</SPAN>style<SPAN class="operator token">></SPAN>`<SPAN class="punctuation token">;</SPAN>
<SPAN class="token function">getName</SPAN><SPAN class="punctuation token">(</SPAN><SPAN class="punctuation token">)</SPAN><SPAN class="punctuation token">;</SPAN>
<SPAN class="keyword token">function</SPAN> <SPAN class="token function">getName</SPAN><SPAN class="punctuation token">(</SPAN><SPAN class="punctuation token">)</SPAN> <SPAN class="punctuation token">{</SPAN>
<SPAN class="keyword token">let</SPAN> cId <SPAN class="operator token">=</SPAN> <SPAN class="token function">$</SPAN><SPAN class="punctuation token">(</SPAN><SPAN class="string token">'span.ida'</SPAN><SPAN class="punctuation token">)</SPAN><SPAN class="punctuation token">.</SPAN><SPAN class="token function">text</SPAN><SPAN class="punctuation token">(</SPAN><SPAN class="punctuation token">)</SPAN><SPAN class="punctuation token">;</SPAN>
<SPAN class="keyword token">if</SPAN> <SPAN class="punctuation token">(</SPAN>cId<SPAN class="punctuation token">)</SPAN> <SPAN class="punctuation token">{</SPAN>
<SPAN class="comment token">//console.log(cId);</SPAN>
<SPAN class="keyword token">let</SPAN> q3 <SPAN class="operator token">=</SPAN> <SPAN class="keyword token">new</SPAN> <SPAN class="token class-name">Query</SPAN><SPAN class="punctuation token">(</SPAN><SPAN class="punctuation token">)</SPAN><SPAN class="punctuation token">;</SPAN>
q3<SPAN class="punctuation token">.</SPAN>where <SPAN class="operator token">=</SPAN> <SPAN class="string token">"id = '"</SPAN><SPAN class="operator token">+</SPAN> cId <SPAN class="operator token">+</SPAN><SPAN class="string token">"'"</SPAN><SPAN class="punctuation token">;</SPAN>
q3<SPAN class="punctuation token">.</SPAN>outFields <SPAN class="operator token">=</SPAN> <SPAN class="punctuation token">[</SPAN><SPAN class="string token">"*"</SPAN><SPAN class="punctuation token">]</SPAN><SPAN class="punctuation token">;</SPAN>
QTt<SPAN class="punctuation token">.</SPAN><SPAN class="token function">execute</SPAN><SPAN class="punctuation token">(</SPAN>q3<SPAN class="punctuation token">)</SPAN><SPAN class="punctuation token">.</SPAN><SPAN class="token function">then</SPAN><SPAN class="punctuation token">(</SPAN><SPAN class="keyword token">function</SPAN> <SPAN class="punctuation token">(</SPAN>results<SPAN class="punctuation token">)</SPAN> <SPAN class="punctuation token">{</SPAN>
results<SPAN class="punctuation token">.</SPAN>features<SPAN class="punctuation token">.</SPAN><SPAN class="token function">map</SPAN><SPAN class="punctuation token">(</SPAN><SPAN class="keyword token">function</SPAN> <SPAN class="punctuation token">(</SPAN>feat<SPAN class="punctuation token">)</SPAN> <SPAN class="punctuation token">{</SPAN>
<SPAN class="keyword token">let</SPAN> pID <SPAN class="operator token">=</SPAN> feat<SPAN class="punctuation token">.</SPAN>attributes<SPAN class="punctuation token">[</SPAN><SPAN class="string token">"id"</SPAN><SPAN class="punctuation token">]</SPAN><SPAN class="punctuation token">;</SPAN>
<SPAN class="keyword token">if</SPAN> <SPAN class="punctuation token">(</SPAN>cId <SPAN class="operator token">===</SPAN> pID<SPAN class="punctuation token">)</SPAN> <SPAN class="punctuation token">{</SPAN>
name_plc <SPAN class="operator token">=</SPAN> feat<SPAN class="punctuation token">.</SPAN>attributes<SPAN class="punctuation token">[</SPAN><SPAN class="string token">"place"</SPAN><SPAN class="punctuation token">]</SPAN><SPAN class="punctuation token">;</SPAN>
console<SPAN class="punctuation token">.</SPAN><SPAN class="token function">log</SPAN><SPAN class="punctuation token">(</SPAN>name_plc<SPAN class="punctuation token">)</SPAN><SPAN class="punctuation token">;</SPAN>
<SPAN class="keyword token">let</SPAN> tx <SPAN class="operator token">=</SPAN> <SPAN class="token function">$</SPAN><SPAN class="punctuation token">(</SPAN><SPAN class="string token">'.name_plc'</SPAN><SPAN class="punctuation token">)</SPAN><SPAN class="punctuation token">.</SPAN><SPAN class="token function">text</SPAN><SPAN class="punctuation token">(</SPAN><SPAN class="punctuation token">)</SPAN><SPAN class="punctuation token">;</SPAN>
<SPAN class="keyword token">if</SPAN> <SPAN class="punctuation token">(</SPAN>tx <SPAN class="operator token">==</SPAN> <SPAN class="number token">0</SPAN><SPAN class="punctuation token">)</SPAN><SPAN class="punctuation token">{</SPAN>
<SPAN class="token function">$</SPAN><SPAN class="punctuation token">(</SPAN><SPAN class="string token">".name_plc"</SPAN><SPAN class="punctuation token">)</SPAN><SPAN class="punctuation token">.</SPAN><SPAN class="token function">append</SPAN><SPAN class="punctuation token">(</SPAN>name_plc<SPAN class="punctuation token">)</SPAN><SPAN class="punctuation token">;</SPAN>
<SPAN class="punctuation token">}</SPAN>
<SPAN class="punctuation token">}</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">)</SPAN><SPAN class="punctuation token">;</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">)</SPAN><SPAN class="punctuation token">;</SPAN>
<SPAN class="punctuation token">}</SPAN> <SPAN class="keyword token">else</SPAN> <SPAN class="punctuation token">{</SPAN>
<SPAN class="token function">setTimeout</SPAN><SPAN class="punctuation token">(</SPAN>getName<SPAN class="punctuation token">,</SPAN> <SPAN class="number token">230</SPAN><SPAN class="punctuation token">)</SPAN><SPAN class="punctuation token">;</SPAN>
<SPAN class="punctuation token">}</SPAN>
<SPAN class="punctuation token">}</SPAN>
<SPAN class="keyword token">return</SPAN> dlv<SPAN class="punctuation token">;</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">,</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">;</SPAN>
fl <SPAN class="operator token">=</SPAN> <SPAN class="keyword token">new</SPAN> <SPAN class="token class-name">FeatureLayer</SPAN><SPAN class="punctuation token">(</SPAN><SPAN class="punctuation token">{</SPAN>
source<SPAN class="punctuation token">:</SPAN> gras<SPAN class="punctuation token">,</SPAN>
objectIdField<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"ObjectID"</SPAN><SPAN class="punctuation token">,</SPAN>
geometryType<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"polygon"</SPAN><SPAN class="punctuation token">,</SPAN>
fields<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">[</SPAN><SPAN class="punctuation token">{</SPAN>
name<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"ObjectID"</SPAN><SPAN class="punctuation token">,</SPAN>
alias<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"ObjectID"</SPAN><SPAN class="punctuation token">,</SPAN>
type<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"oid"</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="punctuation token">{</SPAN>
name<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"id"</SPAN><SPAN class="punctuation token">,</SPAN>
alias<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"id"</SPAN><SPAN class="punctuation token">,</SPAN>
type<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"string"</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="punctuation token">{</SPAN>
name<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"updated"</SPAN><SPAN class="punctuation token">,</SPAN>
alias<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"Last Update"</SPAN><SPAN class="punctuation token">,</SPAN>
type<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"string"</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="punctuation token">{</SPAN>
name<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"eventTime"</SPAN><SPAN class="punctuation token">,</SPAN>
alias<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"eventTime"</SPAN><SPAN class="punctuation token">,</SPAN>
type<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"string"</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="punctuation token">{</SPAN>
name<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"url"</SPAN><SPAN class="punctuation token">,</SPAN>
alias<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"url"</SPAN><SPAN class="punctuation token">,</SPAN>
type<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"string"</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">,</SPAN> <SPAN class="punctuation token">{</SPAN>
name<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"grid_value"</SPAN><SPAN class="punctuation token">,</SPAN>
alias<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"grid_value"</SPAN><SPAN class="punctuation token">,</SPAN>
type<SPAN class="punctuation token">:</SPAN> <SPAN class="string token">"double"</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">]</SPAN><SPAN class="punctuation token">,</SPAN>
renderer<SPAN class="punctuation token">:</SPAN> renderer<SPAN class="punctuation token">,</SPAN>
popupEnabled<SPAN class="punctuation token">:</SPAN> <SPAN class="keyword token">true</SPAN><SPAN class="punctuation token">,</SPAN>
<SPAN class="comment token">//outFields: ['*'],</SPAN>
popupTemplate<SPAN class="punctuation token">:</SPAN> popupTrails<SPAN class="punctuation token">,</SPAN>
visibleElements<SPAN class="punctuation token">:</SPAN> <SPAN class="punctuation token">[</SPAN><SPAN class="punctuation token">{</SPAN>
featureNavigation<SPAN class="punctuation token">:</SPAN> <SPAN class="keyword token">false</SPAN><SPAN class="punctuation token">,</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">]</SPAN><SPAN class="punctuation token">,</SPAN>
<SPAN class="punctuation token">}</SPAN><SPAN class="punctuation token">)</SPAN><SPAN class="punctuation token">;</SPAN>
map<SPAN class="punctuation token">.</SPAN><SPAN class="token function">add</SPAN><SPAN class="punctuation token">(</SPAN>fl<SPAN class="punctuation token">)</SPAN><SPAN class="punctuation token">;</SPAN><SPAN class="line-numbers-rows"><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN><SPAN></SPAN></SPAN>Here is my full CodePen as well.. Any way to do this client side javascript? simply change index to smallest polygons on top?! 1/3 times some of my polygons render in the correct order.. but I need to ensure they all always do, so they are visible and I can click them.