I've seen some posts about symbolizing by date (I find it odd that Esri still hasn't come up with a good way to do this) in ArcMap but I haven't seen anything for Pro. I cannot figure out a logical way to symbolize by date. I am working with Collector to collect sidewalk details. It would be nice to be able to track my progress and I thought doing this by date would be the best way. I have a last edited date field that would work perfectly. I could also create a new date field if that autoupdated field is an issue. I've also considered using the YYYMMDD format in a text field but I would have to enter it like that each time I did an edit which is kind of a pain. Seems to me that date or time should be a simple way to symbolize something. Is there something preventing Esri from implementing this?