I have created a geometric network for a water system. While I do split all my mains at the valve (even though I get those tiny segments at tees), do I need to split my lateral lines at the valve too? I'm using the Local Government model, so all my laterals (hydrant, fire, commercial, etc.) are in the same feature class.